| PLANNING ACT 2023 - PROPOSAL FOR EARTHWORKS, SUBDIVISION AND LEASE VARIATION - demolition of existing structures, fences and tree removal, driveway/verge crossing, on-site and off-site infrastructure works, landscaping and earthworks, entrance signage and associated works. SUBDIVISION of Block 12 Section 111 Symonston and Block 2233 Jerrabomberra into 7(seven) blocks; and additional 1(one) substation block, 1(one) storm water attenuation block and road reserve block which are to be handed back to the ACT Government. LEASE VARIATION to add multiple additional uses as listed under the DEVOUTCOMEREP and the Application FORM (Pg 4/5); and include the Gross Floor Area (GFA) limitations in the Crown Leases of the resulting blocks. - ACT Planning & Land Authority 202544243 | 722 Canberra Avenue, Jerrabomberra, ACT | 12 Jul 2025 |
| THE PUBLIC NOTIFICATION PERIOD HAS BEEN EXTENDED - PLANNING ACT 2023 - PROPOSAL FOR CEMETERY - Proposed works for the first stage of the proposed Southern Memorial Park comprising of a new entrance, including a signalised intersection with Mugga Lane, 2,500 traditional burial plots, relocation of horse jumping area, realignment of equestrian trail, construction of internal roads and basin, utility reticulation, construction of works depot with office and sheds, landscaping, tree removal, civil works and associated works. -
ACT Planning & Land Authority
202443292 | Mugga Lane, Tuggeranong, ACT | 22 Oct 2024 |
| PROPOSAL FOR PUBLIC WORKS - construction of 230m of dual circuit overhead 132kV powerlines between the ACT/NSW border and a connection point immediately east of the Oaks Estate TransGrid Substation. The proposed works comprise of pole installation, site establishment, and other associated works. This is a concurrent development application concurrent with an Environmental Impact Statement (EIS202100042). The development application cannot be finalised until the EIS process is complete. If the EIS is refused, rejected or withdrawn, the development application is taken to have been refused. For more information and to comment on the EIS application, please go to https://www.planning.act.gov.au/development-applications-assessments/assessment-of-development/environmental-impact-assessment/environmental-impact-statements - ACT Planning & Land Authority 202341436 | Canberra Avenue, Jerrabomberra, ACT | 28 Mar 2023 |
| PROPOSAL FOR PUBLIC WORKS - The proposal is for the construction of a new 132 kV transmission line, approximately 3.6km long, located across numerous blocks in Symonston and Jerrabomberra. The line will extend from the existing East Lake-Gilmore 132 kV transmission line on the Monaro Highway, along the Hindmarsh Drive and Canberra Avenue southern road reserves to HMAS Harman. The proposed installation is to be completed using 8 steel poles, 21 concrete poles, and other associated works. Prior to submitting a Development Application in the Impact Track, the proponent (Evoenergy) was required to prepare an Environmental Impact Statement (EIS) for this proposal (EIS201900038). On 15 November 2022, the EIS was completed. - ACT Planning & Land Authority 202241244 | 722 Canberra Avenue, Jerrabomberra, ACT | 28 Feb 2023 |
| PROPOSAL FOR COMMERCIAL DEVELOPMENT AND LEASE VARIATION - Construction of animal care facility including ancillary dwelling, associated car parking, driveways, septic systems, waste collection, fencing and associated works. Variation to the Crown lease to add animal care facility as an additional use and permit a second ancillary dwelling. - ACT Planning & Land Authority 202037060 | 10494 Monaro Highway, Jerrabomberra, ACT | 23 Jul 2020 |